Haunching material
WebApr 2, 2024 · The nature of the haunching material and the quality of its placement are one of the most important factors in limiting the deformation of PE pipe. Primary Initial Backfill – This zone of backfill provides the primary support against lateral pipe deformation. To ensure such support is available, this zone should extend from trench grade up to ... Web1. Compaction and soil symbols – i.e. “95% Category I” refers to Category I soil material with a minimum Standard Proctor compaction of 95%. See Table 2 for equivalent Modified Proctor values. 2. Soil in the outer bedding, haunch, and lower side zones shall be compacted to at least the same compaction as the majority of soil in the ...
Haunching material
Did you know?
WebThe same material can be used for the next layer, called the haunch. This material is applied to the midpoint of the pipe to provide lateral support and keep fines from migrating in from the trench walls. Some jurisdictions require haunching material be gravel not more than 3/4 inch in diameter, so check what is required in your area. WebThe most important factor affecting the pipe performance and deflection is the haunching material and its density - Material should be placed and consolidated under the pipe …
Webhaunching The portion of the material placed in an excavation on either side of and under a pipe from the top of the bedding up to the springline or horizontal centerline of the pipe. This backfill layer extends from one trench sidewall to the opposite sidewall. http://www.owp.csus.edu/glossary/haunching.php
Weborganic matter, but free of frozen material, waste metal products, unsightly debris, toxic material, or other deleterious materials. c. Material Excavated from Trench and meeting these requirements: Use when approved by Engineer; otherwise excavate, haul, and place Borrow Material. 2. General Borrow Material Requirements. a. WebC. Earth materials utilized for bedding and haunching shall be suitable materials selected from materials excavated from the trench. Suitable materials shall be clean and free of rock larger than 2-inches at its largest dimension, organics, cinders, stumps, limbs, frozen earth or mud, man-made wastes and other unsuitable materials.
WebHaunching material may be Class 1 and must be placed and compacted in 6-inch loose/4-inch compacted maximum lifts, compacted to 95 percent standard proctor density. ... Granular bedding material is commonly used as backfill in the haunch zone (below the springline) as well as for primary and secondary backfill zones, depending on the pipe ... edit exe file visual basicWebHaunching or edge of carriageway strengthening has become an increasingly important highway maintenance technique in the UK. This report outlines the extent of the problem, … edit excel userform listboxWebJun 14, 2024 · Proper selection of haunching material is essential to the PVC pipes’ ability to support vertical loads. It is frequently a special material with sizes not exceeding 3/4 inch. The haunching procedure is to tamp the embedment materials under the haunches and around the pipe to the midline of the pipe to provide effective support. 3. edit exchange global address listWebStep 8. Place the Haunching Concrete. Once concrete is sufficiently stiff, place haunching concrete at the back along the full length of edging. Use a spade, shovel or if the space is narrow, a trowel. In general, haunching should extend at least half way up the back of a stone but you can finish it 1" to 2" (25 mm to 50 mm) below the top edge. edit exchange distribution list in outlookWebAug 17, 2015 · The purpose of this paper is to evaluate the effect of different haunching techniques (i.e., placement and compaction of material underneath the pipe in the haunches) on the predicted structural ... conned againWebMaterials used for haunching shall be the same class as that used for bedding. Prior to placement and compaction of initial backfill, the Engineer shall inspect the placement of the water main and laterals, haunching and compaction. Care shall be exercised in placing haunching material to prevent damage to or displacement of, the water pipe. edit exchange attributesWebC. Haunching: Material placed on either side of pipe from top of bedding up to springline of pipe and horizontally from one trench sidewall to opposite sidewall. D. Initial Backfill: … edit exchange distribution list